Project Metrics


  • 3,000 Fiber Optic Terminations
  • 18.93 miles of Fiber Optic Cabling Installed
  • 5,000 Data Terminations
  • 18.93 miles of Data Cabling Installed
  • 100+ Frey Electric workers at peak
  • Temperature Range -22° F to 92° F
  • 900 TVs mounted
  • 2,500 Data Drops
  • 4,000 feet of Cable Tray
  • 149 Site Light Poles
  • Wifi


  • Power

  • Lighting

  • Fire Alarm

  • Security

  • Communications

  • Data

  • BMS